Commissioning time : 2015
Location: Anhui, China
Material: Limestone
Capacity: 18-20TPH
Finished size: 200 mesh
The customer is a supplier of limestone powder to local road asphalt concrete mixing plant, the demand is large, and the construction period is short, requires the powder within two months. Therefore, the customer must find a manufacturer with reliable quality and high level of production capacity in a very short time. Customers quickly chose us because they believe in our brand. We have also done well in a short period of time to complete the tasks. Design scheme, produce equipment, delivery on schedule, installation and commissioning, the customer began production on schedule, and the finished powder quality is very satisfied.
Please fill in the form with your information and specific needs, which will help us to get in touch with you as soon as possible and provide you suitable solution and a reasonable equipment quote.